- The first 20 foot existing section has been repaired and a new armoured entry/exit ramp was carved out of the rotten cedar. The old wood was carved out and replaced with layers of rock bedded in sand with a retaining crib made of treefall and cedar. A new stringer replaced a rotten original and treads were resecured. New supports spread the load away from the rotten filling and down into the ground. The supports were dug in and placed onto a rock foundation before refilling the holes. Only 50 feet to go!
Repaired after vandalism
Friday, February 22, 2008
Feb 22 2008 - The Big Log project has begun!